OpenChainGraph Suite · ART-188 · Prudential & Basel Risk

IRRBB Disclosure Readiness Diagnostic

A–F readiness diagnostic across five IRRBB dimensions: EVE shock calculation performed, SOT (EVE + NII) evaluated, standardised approach mapped, CSRBB scope assessed, and Pillar 3 IRRBB1 disclosure template ready. Terminal node of the irrbb-measurement-and-disclosure chain with Policy Mandate and W3C VC export. Zero network.

IRRBB A–F Grade Pillar 3 IRRBB1 Zero PII W3C VC §13.11 v0.5.0
🔒 All inputs are processed locally in your browser. No data is transmitted. Do not enter real personal data — use synthetic or anonymised inputs only.
Scope
Terminal node of irrbb-measurement-and-disclosure chain (art-186→187→188). Five binary dimensions covering IRRBB measurement and disclosure readiness. Grading: A (5/5), B (4/5), C (3/5), D (2/5), F (0–1/5). Pillar 3 IRRBB1 is the Basel Framework disclosure template (DIS70) covering EVE/NII sensitivity.
Presets
Readiness Dimensions
eve_shock_calculated
Delta EVE has been calculated under all 6 BCBS d368 standardised shock scenarios.
sot_eve_nii_evaluated
Both legs of the Supervisory Outlier Test (EVE and NII) have been evaluated.
standardised_approach_mapped
NMD positions are mapped to the EBA standardised-approach behavioural caps.
csrbb_scope_assessed
CSRBB scope has been identified and governance gaps remediated.
pillar3_irrbb1_ready
Pillar 3 IRRBB1 disclosure template (Basel Framework DIS70) is populated and ready for filing.
Readiness Results